Amec / Alstom

Client
Amec / Alstom

Project
Longannet Power Station

Location
Scotland

Engineers
Amec / Peers

As part of Peers recent 7.5 Million contract with Amec /Alstom, the modular erection of the GGH Structure top sections have been designed and installed as a modular build of approx 132 tonnes. The lift was carried out by Amec and Peers to reduce the programme for erection and allow other construction activities to take place in parallel.