Harry Peers Steelwork Logo
Client: Amec / Alstom
Project: Longannet Power Station
Location: Scotland
Engineers: Amec / Peers
Scope of Work:
As part of Peers current £6 Million contract with Amec /Alstom, the modular erection of the GGH Structure top sections have been designed and installed as a modular build of approx 132 tonnes.
The lift was carried out by Amec and Peers to reduce the programme for erection and allow other construction activities to take place in parallel.