EDF Modular Roof

Client
Cheshire Cavity Storage

Project
EDF Energy Project

Location
Warmingham

Engineers
Amec / Peers for Lifting & Temporary Works

Value
£61,000

Quantity of Steelwork
6 tonnes

Peers has completed the contract for EDF to supply, delivery and erect the Modular structural steelwork, roofing and cladding for the 33Kv Transformer Pen at Gas Storage Facility, Hill Top Farm, Warmingham, Cheshire. The project included for the connection design, engineering, fabrication, galvanising, painting, delivery, assembly and lifting/Installation of the roof structure and wall cladding. The modular installation allowed the completion of the works with minimal disruption to the EDF facility.

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.