Peers Modular Innovation at Hitachi Ferrybridge Power Station

Client
Hitachi

Project
FGT Steel Structure, Fluxe Gas Turbine

Location
Ferrybridge

Engineers
Hitachi Zosen Inova /Peers for Lifting & Temporary Works

Quantity of Steelwork
620 tonnes

Harry Peers Steelwork 2 Million pound steelwork contract for Zurich based Hitachi Zosen Inova was enhanced by the introduction of a modular Penthouse roof solution. Peers Design Team led by Chris Achilles, worked closely with HZI to change the original stick built structure design into a two section modular solution for the Penthouse roof which was lifted into position 30 metres above ground level utilising the site tower crane. The 600t contract benefitted from a modular pre- assembly approach to walkways, platforms and stair units to significant areas of the build.

Covid-19 Risk Assessment Update

Peers have recently carried out several Risk Assessments to ensure the health and safety of its employees and visitors during this global Pandemic. We will continue to monitor the news and guidance around the Pandemic and update accordingly.

COVID 19 Factory Control Measures all business unit summary COVID 19 Office Control Measures all business unit summary COVID 19 Construction Control Measures all business unit summary

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.