Peers Modular Innovation at Hitachi Ferrybridge Power Station

Client
Hitachi

Project
FGT Steel Structure, Fluxe Gas Turbine

Location
Ferrybridge

Engineers
Hitachi Zosen Inova /Peers for Lifting & Temporary Works

Quantity of Steelwork
620 tonnes

Harry Peers Steelwork 2 Million pound steelwork contract for Zurich based Hitachi Zosen Inova was enhanced by the introduction of a modular Penthouse roof solution. Peers Design Team led by Chris Achilles, worked closely with HZI to change the original stick built structure design into a two section modular solution for the Penthouse roof which was lifted into position 30 metres above ground level utilising the site tower crane. The 600t contract benefitted from a modular pre- assembly approach to walkways, platforms and stair units to significant areas of the build.

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.