Saica Paper

Client
Saica Paper

Project
PM11 Project

Location
Partington

Engineers
Peers in conjunction with IDON

Quantity of Steelwork
700 tonnes

Harry Peers 3 million contract for steelwork at Saica Paper, Partington, Manchester, has moved into the delivery phase. The design, fabrication and nightshift installation of the modular cable/piperacks has been recognised as a significant benefit to the project. Peers, working closely with the Christal Management Team and the Client have sequenced the construction of the modular racks in conjunction with their steelwork structures and secondary steel packages. The design and build of additional piperacks and a conveyor bridge have also been added to the Peers package which will also have elements of modular build to enable installation as the plant is entering the commissioning phase.

Covid-19 Risk Assessment Update

Peers have recently carried out several Risk Assessments to ensure the health and safety of its employees and visitors during this global Pandemic. We will continue to monitor the news and guidance around the Pandemic and update accordingly.

COVID 19 Factory Control Measures all business unit summary COVID 19 Office Control Measures all business unit summary COVID 19 Construction Control Measures all business unit summary

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.