Vivergo Modular Piperacks

Client
Vivergo (BP / British Sugar / Dupont)

Project
Bioethanol Plant

Location
Saltend Hull

Engineers
Aker Solutions / Peers Design

Value
£1,800,000

In addition to the steelwork contract for the major structures at the Vivergo Project, Peers were engaged to carry out the detailed design and development of 21 No. Modular Piperacks and supports. The racks were fabricated at Peers facility in Bolton, then assembly and mechanical installation carried out at the Redhall Engineering facility in Middlesbrough. Peers delivered the PARs to site and installed the units during night shifts to minimise construction disruption.

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.