Air Products Teeside Project Award Embraces BIM

Mon 1st Sep 2014

Harry Peers Steelwork have been awarded the contract to provide 2000 tonnes of steelwork to the Air Products Energy from Waste Project at Teeside.

The Project is embracing the benefit of BIM which involves the transfer of over 130SDNF models from the Design Team at Foster Wheeler into Peers Tekla system.

Peers in house Design and Engineering Team then complete the connection design, finalise the model joints and return the models back to Foster Wheeler / Air Products for clash checking and verification.

The contract also includes the fabrication and erection of steelwork, flooring and handrail packages.

The award of this new contract follows the successful completion of the ASU contract for Air Products in 2013.

Previous ImageNext Image
BIM

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.