BEPPS1-DIFF - Shield Door Installation

Client
M+W Group

Nuclear Project
BEPPS1/DIFF Shield Door Installation

Location
Sellafield

Engineers
M+W

Value
£250,000

Quantity of Steelwork
20 tonnes

HPSL were engaged by M+W on the BEPPS1/DIF project within the Sellafield site to install the lid lift and transfer cell shield door guides, guide rails, support stools and associated mechanical items to allow each of the 10 tonne shield doors to be installed, these doors will eventually provide shielding from the radioactive inventory which will be stored within the building as part of the ongoing decommission works at the plant. Each of the items installed had to be lined, levelled and welded to within +/- 1mm of design position to allow the doors to function properly, a task which HPSL in conjunction with our client M+W achieved on schedule to allow the doors to be successfully installed by Mammoet on the 15th August 2018. A great example of collaborative working to deliver another successful project.

Previous ImageNext Image
9594-web-1 9594-web-2 9594-web-3 9594-web-4

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.