MCS Project

Client
Nuvia

Nuclear Project
MCS Project

Location
Trawsfynydd

Engineers
Nuvia-Peers

Value
£78,400

Quantity of Steelwork
8 tonnes

Supply and erection of a 5 Tonne rolling containment structure and trial erection at Peers modular build compound in Bolton. Project also included the design and supply of the temporary track support frame. The biggest challenge on this project was developing a suitable build sequence that would replicate site conditions where only a single 25T crane could be used. As the main frames had wheels this lead to Peers design team developing light weight temporary "A" frames to aid construction.

Previous ImageNext Image
9552-2 9552-3 9552-4 9552-5

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.