Air Products TV2

Client
Air Products

Project
TV2

Location
Teesside

Engineers
Amec Foster Wheeler

Value
£6,000,000

Quantity of Steelwork
1790 tonnes

Peers Steelwork were awarded the contract for the supply, delivery and installation of almost 2,000 Tonnes of structural steelwork, handrailing, open type flooring and ladders for a new waste to energy supply facility at Teesside. Part of the installation was to create a 100 Tonne Modular Support Structure for the Gasifier which was built at ground level and lifted into place to avoid working at height. This was successfully completed having started the lift in the early hours but demonstrated the effectiveness of modular construction.

Previous ImageNext Image
9568-1 9568-2 9568-3 9568-4

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.