Boultings

Client
Boultings

Project
London Gateway Project

Location
Shell Haven

Engineers
Foster Wheeler

Quantity of Steelwork
150 tonnes

Peers have successfully completed the supply of 8 pipebridge modules working with Boultings Group on the London Gateway Project at Shell Haven. The biggest modules 3.4 m wide, 4m high and 20 m long, weighed 26 tonne and were delivered using extendable swan neck low loader trailers and purpose built transport beams. All the bridge sections were assembled at temporary supports at Peers workshop in Bolton using the insulated pipework. All main towers and trestles were also assembled offsite and delivered as modules which dramatically reduced the working at height on site.

Previous ImageNext Image
Boultings 1 Boultings 2 Boultings 3 Boultings 5

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.