Foster Wheeler

Quantity of Steelwork
150 tonnes

Peers have successfully completed the supply of 8 pipebridge modules working with Boultings Group on the London Gateway Project at Shell Haven. The biggest modules 3.4 m wide, 4m high and 20 m long, weighed 26 tonne and were delivered using extendable swan neck low loader trailers and purpose built transport beams. All the bridge sections were assembled at temporary supports at Peers workshop in Bolton using the insulated pipework. All main towers and trestles were also assembled offsite and delivered as modules which dramatically reduced the working at height on site.

Previous ImageNext Image
Boultings 1 Boultings 2 Boultings 3 Boultings 5

Covid-19 Risk Assessment Update

Peers have recently carried out several Risk Assessments to ensure the health and safety of its employees and visitors during this global Pandemic. We will continue to monitor the news and guidance around the Pandemic and update accordingly.

COVID 19 Factory Control Measures all business unit summary COVID 19 Office Control Measures all business unit summary COVID 19 Construction Control Measures all business unit summary

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.