Hitachi
Client
Hitachi Zosan Inova
Project
Ferrybridge Power Station FGT
Location
Ferry Bridge, Yorkshire
Engineers
Hitachi / Peers
Quantity of Steelwork
600 tonnes
Swiss company Hitachi Zosen Inova has appointed Peers to carry out the 2 million contract to carry out the connection design, fabrication and erection of primary and secondary steelwork to the FGT structure at their Power station project at Ferrybridge, Yorkshire. Peers contract includes the development of the design by their in-house design and engineering team to incorporate modular stair units, walkways and Pre- clad modular penthouse structures.








Contact Information
- Harry Peers Steelwork Limited
- Elton Street
- Mill Hill
- Bolton
- Lancashire
- BL2 2BS (For SatNav use BL2 2BU)
- For directions see our Contact Page
- Tel: 01204 558500
- email post@peers.co.uk
Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.