Hitachi

Client
Hitachi Zosan Inova

Project
Ferrybridge Power Station FGT

Location
Ferry Bridge, Yorkshire

Engineers
Hitachi / Peers

Quantity of Steelwork
600 tonnes

Swiss company Hitachi Zosen Inova has appointed Peers to carry out the 2 million contract to carry out the connection design, fabrication and erection of primary and secondary steelwork to the FGT structure at their Power station project at Ferrybridge, Yorkshire. Peers contract includes the development of the design by their in-house design and engineering team to incorporate modular stair units, walkways and Pre- clad modular penthouse structures.

Previous ImageNext Image
9553 9553 2 9553 3 9553 4 9553 5 9553 6 9553 7 9553 8

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.