Lynemouth Power Station

Client
Sir Robert McAlpine

Project
Lynemouth Power Station

Location
Lynemouth, Northumberland

Engineers
Fairport and Clancy

Value
£12,000,000

Quantity of Steelwork
3750 tonnes

Peers Steelwork provided the internal Silo Hoppers, Shedder Plates and supporting structural steelwork along with the pre-assembled Silo Roofs and access ways for the extension to Lynemouth Power Station. The Silo Roofs were pre-assembled on site and the 210 tonne final assemblies were lifted into place on a precision fitted ring beam.

Previous ImageNext Image
9608-1 9608-2 9608-3 9608-4 9608-5 9608-6 9608-7 9608-8

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.