Peers deliver to Centrica

Client
Costain

Project
Centrica York Project

Location
Easington

Engineers
Costain

Quantity of Steelwork
378 tonnes

Harry Peers Steelwork has completed a significant PAU, PAR and Stick Built contract for Centrica in association with Costain. Working to a tight schedule for the design and manufacture, Peers were initially awarded the contract to engineer, fabricate and deliver 8 No. Pre-assembled piperack units. The contract included the management of the specialist 'chartek' fireproofing requirements in association with Barrier Fire Protection and the Mechanical Installation which was carried out by Redhall Engineering. The modules were fabricated at Peers facility in Bolton and shipped to Redhall's facility at Middlesbrough where the installation and testing of pipework , valves and instrumentation were carried out. Close co-ordination and co-operation between Costain, Peers and their Partners ensured that the offsite works were carried out to the specifications required and the delivery of the PARs achieved to the agreed programme to suit the 'on site build'. Peers were also awarded the contracts to engineer and fabricate the steelwork to the Pre-Assembled units and the stick built steel in association with the project.

Previous ImageNext Image
redhall1 redhall2 redhall3 redhall4 redhall5

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.