Sandon Dock WWTW

Client
GCA Consortium

Project
Sandon Dock WWTW

Location
Liverpool

Engineers
GCA-Peers

Value
£2,100,000

Quantity of Steelwork
300 tonnes

Peers Steelwork came up with the innovation of pre-assembling the Decanter Covers and Access Staircases at our Bolton Assembly Facility before delivery and installation at the Sandon Dock WWTW. The Decanter Cover Panels were redesigned with modular construction in mind and post-assembly, all handrailing and flooring was fitted to provide secure access when erected in the final installation. This reduced on site installation time significantly as well as working at height and reduced access limitations around the site for other construction activities.

Previous ImageNext Image
9564-1 9564-2 9564-3 9564-4 9564-5

Contact Information

  • Harry Peers Steelwork Limited
  • Elton Street
  • Mill Hill
  • Bolton
  • Lancashire
  • BL2 2BS (For SatNav use BL2 2BU)
  • For directions see our Contact Page
  •  
  • Tel: 01204 558500
  • email post@peers.co.uk

Please send all correspondence to Head Office at Elton Street,Bolton,BL2 2BS.
We cannot be held accountable for correspondence sent to any other address.